The Nastaran Project is one of the important projects executed by Tahkim Sazan Company in the field of steel structure fabrication and installation, commissioned in 2019. With a total weight of 1,300 tons of steel structure, this project was completed through technical capability, precise management of execution processes, and compliance with up-to-date construction industry standards.
In this project, Engineer Daneshvar served as the Employer, and Engineer Shah-Hosseini acted as the Consultant, supervising the design and execution process. All stages of steel component fabrication, quality control, painting, transportation, and erection were carried out with organized planning and the use of specialized equipment to ensure the structure was executed with the highest level of quality and precision.
Relying on its valuable experience in industrial and construction projects, Tahkim Sazan successfully delivered in the Nastaran Project a safe, durable, and standards-compliant structure to the employer while meeting the project schedule and technical requirements.
Project Specifications
Execution Year: 2019